The AKM 50 at the testing station
04.04.2016
The AKM is checked thoroughly at our testing station specially tailored for absorption refrigerators. No machine leaves the factory without first undergoing a leak and strength test. The new AKM 50 is currently being tested for its performance parameters. Extensive tests and measurements complete the factory test run.